RRB Nsg Superintendent -29 April 2025 (Shift-1st)
Reasoning
Hard

Manish can complete a piece of work in 32 days. He worked for 4 days and then left. Satish completed the remaining work in 16 days. In how much time can Manish and Satish complete the work together?

Appeared in: RRB Nsg Superintendent -29 April 2025 (Shift-1st)

Explanation

  • The core of the problem is to find the individual work rates and then combine them.
  • Manish's 1-day work is 1/32. He works for 4 days, completing 4/32 = 1/8 of the work.
  • The remaining 7/8 of the work is completed by Satish in 16 days. This means Satish's 1-day work rate is (7/8) / 16 = 7/128.
  • Their combined 1-day work rate is the sum of their individual rates: 1/32 + 7/128.
  • To add the fractions, find a common denominator (128): 4/128 + 7/128 = 11/128.
  • The total time to complete the work together is the reciprocal of the combined rate: 1 / (11/128) = 128/11, which is 11 7/11 days.

Why Other Options Were Wrong

  • Option A: This result would arise from an error in calculating the combined work rate or in the final division to convert the improper fraction.
  • Option B: This value might be obtained by miscalculating Satish's work rate or making a mistake while adding the fractions for the combined rate.
  • Option D: This is another incorrect value that likely results from a simple arithmetic mistake at some stage of the calculation, such as finding the LCM or adding the numerators.

Related Visual

Visual explanation — Related Visual
  • Visual 1: Flowchart - A flowchart illustrating the step-by-step calculation: 1. Calculate Manish's work done. 2. Find remaining work. 3. Determine Satish's work rate. 4. Combine rates. 5. Calculate total time.
Clinical Relevance
  • Nursing practice connection: This is primarily an exam-oriented knowledge point with limited direct bedside application, so retain Work and Time Calculation as background academic context rather than a clinical decision trigger.
  • This type of problem tests logical reasoning and the ability to break down a task into measurable units (work rates), a skill useful for planning and resource management.
  • Understanding how to manipulate fractions and calculate rates is a fundamental mathematical skill applicable in various quantitative reasoning scenarios.
  • What if Satish took 21 days to finish the remaining work? Then Satish's rate for the whole work would be 21 / (7/8) = 24 days. His 1-day work would be 1/24. The combined work would be 1/32 + 1/24 = (3+4)/96 = 7/96. The total time would be 96/7 or 13 5/7 days.
How to Approach the Question
  • Identify the question type: This is a classic 'Work and Time' problem.
  • First, determine the rate of work for each individual. The rate is the amount of work done in one unit of time (e.g., 1 day).
  • Calculate the amount of work completed by the first person (Manish) and then determine the remaining work.
  • Use the remaining work and the time taken by the second person (Satish) to find their individual work rate.
  • Add the individual rates to find the combined rate of work.
  • The total time taken to complete the work together is the reciprocal of the combined rate. Convert the final fraction to a mixed number if required.
Concept Tested & Keywords
  • Concept Tested: Work and Time Calculation
  • Stem keywords: complete a piece of work, 32 days, 4 days, 16 days
  • Lead-in keywords: In how much time

Question ID

QfdOLB_Kth9rsuwzy2nlgF

Practise the full RRB Nsg Superintendent -29 April 2025 (Shift-1st)

Attempt every question from this paper in a timed mock, then review the full solution for each one.

More Arrangements & Puzzles Questions

More RRB Nsg Superintendent -29 April 2025 (Shift-1st) Questions