By what percentage has the National Highway (NH) network expanded from 2014 to 2023?

Appeared in: RRB Nsg. Superintendent-2026 (Shift -3rd)

Explanation

  • 60%, representing the approximate percentage growth of India's National Highway (NH) network from 2014 to 2023.
  • Official data shows the NH network grew from 91,287 km in April 2014 to 1,46,145 km by the end of 2023.
  • The calculation for the percentage increase is: ((1,46,145 - 91,287) / 91,287) * 100, which equals approximately 60.1%.
  • This figure is commonly rounded to 60% in official reports and summaries.

Why Other Options Were Wrong

  • Option A: A 70% expansion would imply a final network length of over 1,55,000 km, which is significantly higher than the actual length of 1,46,145 km achieved by 2023.
  • Option C: A 50% expansion is an underestimation. The actual growth was closer to 60%. A 50% increase would mean a final length of about 1,36,930 km, which was surpassed.
  • Option D: A 40% expansion is a significant underestimation of the rapid infrastructure development that occurred during this period. This would correspond to a final length of only about 1,27,800 km.

Related Visual

Visual explanation — Related Visual
  • Visual 1: Line Graph - A line graph showing the year-on-year increase in the total length of National Highways in India from 2014 to 2023. This would visually demonstrate the steep upward trend.
  • Visual 2: Infographic - An infographic comparing the NH length in 2014 versus 2023 with a percentage growth callout box, highlighting the 60% increase.
Clinical Relevance
  • Nursing practice connection: This is primarily an exam-oriented knowledge point with limited direct bedside application, so retain Growth of India's National Highway Network as background academic context rather than a clinical decision trigger.
  • This question tests general awareness, a common component in nursing and other competitive examinations.
  • Knowledge of national infrastructure development reflects an understanding of the country's economic progress and governmental priorities, which can be relevant for context in public health discussions.
  • What if the question asked for the period 2004-2014? The growth was much slower in that decade, and the percentage increase would be significantly lower, making other options potentially correct for that timeframe.
How to Approach the Question
  • First, identify the core question: it asks for the percentage change in the NH network length between two specific years (2014 and 2023).
  • Recall or look for the initial value (length in 2014) and the final value (length in 2023).
  • Apply the formula for percentage increase: [(Final Value - Initial Value) / Initial Value] × 100.
  • Calculate the absolute increase by subtracting the initial length from the final length.
  • Divide the absolute increase by the initial length.
  • Multiply the result by 100 to get the percentage.
Concept Tested & Keywords
  • Concept Tested: Growth of India's National Highway Network
  • Stem keywords: National Highway, NH network, expanded, 2014 to 2023
  • Lead-in keywords: By what percentage

Question ID

QuhJa5pA8RvENZAbtyyXQj

Practise the full RRB Nsg. Superintendent-2026 (Shift -3rd)

Attempt every question from this paper in a timed mock, then review the full solution for each one.

More RRB Nsg. Superintendent-2026 (Shift -3rd) Questions