NCL (Northern Coalfields Limited)-NO
Non Nursing Subjects
Hard

A, B and C together can complete a piece of work in 2 days. If A alone can complete the same work in 6 days and B can do it in 12 days, then how many days will C take to complete thrice the same work?

Appeared in: NCL (Northern Coalfields Limited)-NO

Explanation

  • The core concept is to use work rates (the amount of work done per day). The rate is the reciprocal of the time taken.
  • The combined rate of A, B, and C is 1/2 of the work per day.
  • The individual rates for A and B are 1/6 and 1/12, respectively.
  • C's rate is found by subtracting A's and B's rates from the combined rate: 1/2 - (1/6 + 1/12) = 1/4.
  • If C completes 1/4 of the work per day, C takes 4 days to complete the whole work.
  • The question asks for 'thrice the work', so the final time is 3 * 4 = 12 days.

Why Other Options Were Wrong

  • Option A: This value (36) is incorrect. It might be obtained by incorrectly multiplying B's time (12 days) by 3, i.e., 3 * 12 = 36. This wrongly uses B's time instead of C's calculated time.
  • Option C: This value (24) is incorrect. It could be a result of a calculation error, perhaps by incorrectly adding or multiplying the given numbers, such as 2 * 12.
  • Option D: This value (16) is incorrect. It does not correspond to any logical step in the calculation and is likely a random distractor.

Related Visual

Visual explanation — Related Visual
  • Visual 1: Flowchart: A flowchart illustrating the step-by-step calculation process: Start with given times -> Convert to daily work rates -> Calculate C's work rate -> Calculate time for C to do 1x work -> Calculate time for 3x work.
Clinical Relevance
  • Nursing practice connection: This is primarily an exam-oriented knowledge point with limited direct bedside application, so retain Work and Time as background academic context rather than a clinical decision trigger.
  • This question tests quantitative aptitude, a key skill for competitive examinations.
  • The ability to break down a problem into smaller, manageable parts is crucial for logical reasoning and problem-solving in any field.
  • What if the question asked for half the work? The time taken would be (Time for one work) / 2, which is 4 / 2 = 2 days.
How to Approach the Question
  • First, identify the time taken by each individual or group as stated in the problem.
  • Convert these times into 'work rates'. The work rate is the fraction of work done in one unit of time (in this case, one day). It is calculated as 1 / (Total time taken).
  • Set up an equation using the work rates. Here, the equation is: (A's rate) + (B's rate) + (C's rate) = (Combined rate of A, B, C).
  • Solve the equation to find the unknown variable, which is C's work rate.
  • Once you have C's work rate, find the time C takes to complete one unit of work by taking the reciprocal of the rate (Time = 1 / Rate).
  • Read the question carefully for the final step. Here, it asks for 'thrice the work', so multiply the time for one unit of work by 3.
Concept Tested & Keywords
  • Concept Tested: Work and Time
  • Stem keywords: complete a piece of work, together, alone, thrice the same work
  • Lead-in keywords: how many days
  • Negative lead-in flag: false

Question ID

QaeY80HV0jJ0nv6OVS8UW-

Practise the full NCL (Northern Coalfields Limited)-NO

Attempt every question from this paper in a timed mock, then review the full solution for each one.

More Mathematics Questions

More NCL (Northern Coalfields Limited)-NO Questions